Simple installation steps
- Check all goods against list. Pay attention to the steel-seal letter 1↓ 1↑2↓2↑3↓3↑4↓4↑ on the surface of the scale-bodies,load cells,iron cases(See the following figure).Be ready to install.
1↓ 2↓ | 3↓ 4↓ |
1↑ 2↑ | 3↑ 4↑ |
Lift the scale-bodies of corresponding marking with the 28MM shackle and assemble with a crane(usually 15T),overturn and lie them flat(pad wood under the scale bodies to prevent the paint scalling off),the marking of 1↓2↓ with the marking of 1↑2↑ of the scale body,the marking of 3↓ 4↓with the marking of 3↑4↑of the scale-body,each should be tighten the scale-bodies with 105 sets of M20×60 socket head cap bolts with M30 adjustable spanner.M20 socket head cap spanner andφSimple installation steps
相关产品
免责声明
- 凡本网注明“来源:化工仪器网”的所有作品,均为浙江兴旺宝明通网络有限公司-化工仪器网合法拥有版权或有权使用的作品,未经本网授权不得转载、摘编或利用其它方式使用上述作品。已经本网授权使用作品的,应在授权范围内使用,并注明“来源:化工仪器网”。违反上述声明者,本网将追究其相关法律责任。
- 本网转载并注明自其他来源(非化工仪器网)的作品,目的在于传递更多信息,并不代表本网赞同其观点和对其真实性负责,不承担此类作品侵权行为的直接责任及连带责任。其他媒体、网站或个人从本网转载时,必须保留本网注明的作品第一来源,并自负版权等法律责任。
- 如涉及作品内容、版权等问题,请在作品发表之日起一周内与本网联系,否则视为放弃相关权利。